Floor restoration for warehouses & distribution centers

Large slabs, hard-wheel traffic and joints taking the punishment. Restoration that targets the failure points instead of resurfacing everything.

Who we talk to

The problems on the table

Typical decision-makers: Facility Manager · Operations Manager

  • Forklift damageHard wheels destroy unsupported joint edges faster than anything else in the building.
  • Joint failureOnce the edge chips, every pass makes it worse and the damage widens.
  • DustingDust settles on inventory and racking and never stops being a housekeeping cost.
  • Surface wearTraffic aisles wear out long before the rest of the slab does.
Warehouse & Distribution — JK original illustration
Aisle-firstScope priority
Semi-rigidJoint filler system
Zone-basedRacking relocation
Grind & sealCommon finish
Our approach

How we work in this environment

01

Aisle-priority scope

We start where the damage and the traffic actually are, not uniformly across 200,000 sq ft.

02

Semi-rigid joint repair

The joint edge is cut back and supported so wheel loads stop chipping it.

03

Racking-aware phasing

Work is sequenced around what can be relocated and when, agreed with your operations team.

04

Economical finishing

Grind & seal for most warehouse areas; polishing where cleanability and light matter.

Before / after

What restoration changes

Drag the handle to compare a damaged slab with the same area after removal, joint repair, grinding and finishing.

Illustration of a typical restoration sequence. JK project photography will replace it as documented projects are completed.

Before — existing slab After — restored
Interactive · 30 seconds

Floor condition self-check

Tick everything you can see on your slab today. The tool maps your conditions to the restoration steps a real site assessment would look at.

Interactive · planning estimate

Downtime & phasing planner

Facility managers do not ask "how much per square foot" first — they ask "how long is my floor out of service." Move the inputs to see how area, access and shift choice change the plan.

Est. crew days
Work zones
Work window

How this is calculated: planning-only assumptions of roughly 1,800–3,000 sq ft per 8-hour crew day depending on scope, reduced for restricted access and adjusted for the work window. It is a scheduling sketch, not a quote. Real duration is set on site after slab hardness, coating type and moisture testing.

Start with a free floor assessment.

Tell us the facility type, approximate square footage and what the floor is doing today. We will walk the slab, document the condition and come back with a scope and schedule.