Reliable field execution. Clear communication. Schedule-focused coordination. 15 years of Georgia construction and remodeling experience behind the flooring scope.

Why estimators call back

You are buying certainty, not a low number

The flooring package is usually near the end of the program, which means it absorbs everyone else's delays. What a project manager needs is a subcontractor who states a real duration, shows up with the crew that was promised, and reports honestly when something changes.

  • Documented scope and exclusionsNo surprises at the closeout meeting.
  • Realistic durationsDay counts derived from area, access and shift pattern.
  • Occupied-site discipline15 years of working inside buildings that never stopped operating.
  • Single point of contactA Georgia decision-maker who answers the phone.
JK TOTAL SOLUTIONS INDUSTRIAL FLOORING SUBCONTRACTOR Reliable field execution. Clear communication. Schedule-focused coordination. 15 years of Georgia construction and remodeling experience.
Prequalification information

What you need before you bid us

Scope of workConcrete grinding, coating removal, joint and crack repair, polished concrete, grind & seal, resurfacing.
Service areaGeorgia headquarters — North Georgia corridor and Greater Atlanta as the base area. Traveling crews available for out-of-state and multi-site programs nationwide, with mobilization and travel quoted separately.
Field capabilityZone-based execution in occupied facilities, HEPA dust extraction, containment, night and weekend windows.
Safety and PPESite-specific PPE, tool-connected extraction, housekeeping and end-of-shift cleanup included in scope.
ScheduleRate-based day counts by area, access condition and shift pattern, reported against your program.
RFQ submissionSend drawings, area take-off, existing floor condition and required finish. We respond with scope, exclusions and duration.
Insurance & documentationCertificates and project documentation provided at award. Requirements confirmed per project.
Contact(678) 301-0017 · houstep@naver.com

Insurance limits, bonding and licensing requirements are confirmed per project prior to award.

Execution

The sequence we will run on your site

STEP 01 / 08

Slab assessment and documentation

We walk the floor with the facility team, record slab condition, joint damage, coating type and moisture indicators, then map the area into workable zones.

  • Existing coating identification
  • Joint and crack mapping
  • Slab hardness and profile check
  • Zone and access plan
Interactive · planning estimate

Downtime & phasing planner

Facility managers do not ask "how much per square foot" first — they ask "how long is my floor out of service." Move the inputs to see how area, access and shift choice change the plan.

Est. crew days
Work zones
Work window

How this is calculated: planning-only assumptions of roughly 1,800–3,000 sq ft per 8-hour crew day depending on scope, reduced for restricted access and adjusted for the work window. It is a scheduling sketch, not a quote. Real duration is set on site after slab hardness, coating type and moisture testing.

Interactive · 30 seconds

Floor condition self-check

Tick everything you can see on your slab today. The tool maps your conditions to the restoration steps a real site assessment would look at.

Send us the floor package.

Drawings, area take-off, existing condition and required finish. We come back with scope, exclusions and a duration you can put in the schedule.